Hotel in Chester

Drywall Machines took part in construction of a hotel in Chester which is a part of a
European hotel chain. Similar projects have been carried out across whole Europe.
The project in Chester was made up of two four-storeyed blocks where Mezz and Lower
ground floor areas required a lot of partitioning works.
Drywall Machines, as a sub-contractor, have contributed to the project by doing the
following:
– Building 1 st fix and 2 nd fix partitions
– Numerous bulkheads all over the building
– Other works such as letterboxes forming
Some works required the use of MEWPS and aluminium towers for high level access for
which we have all necessary licenses such as IPAF and PASMA.
During this project we encountered difficulties related to the 1 st wave of the Coronavirus
pandemic. The site was shut down and we were only able to return to work after Main
Contractor Management Team had put all safety measures in place.
Trades numbers were reduced by 50% to allow working safely on site. We are glad that
none of our team had COVID-19 during this project.

DRYWALL MACHINES UK

Hotel in Chester

DRYWALL MACHINES UK | DRY-LINING SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | PARTITIONS SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | TAPE AND JOINTING SERVICES

REQUEST A QUOTE

Hotel in Manchester City Centre

Drywall Machines took part in construction works of Circle Square project – a neighbourhood comprising office space, apartments, student accommodation, hotels and much more. We worked on a hotel construction as well as a large car park with lifts, a restaurant with surrounding areas such as offices, comms rooms, restrooms and other staff areas. The hotel which consists of 6 floors, with about 30 rooms per floor, was our main work on this project. We worked on the project during its final stage. As common works such as 1st fix and 2nd fix, as well as most ceilings had been completed including spray plastering. We had to tight all remedies, complete snagging on the existing works, install suspended ceilings, shaft walls, lift fronts, as well as complete soffit insulation on the car park, do some external works such as SFS, fit access panels of different types and sizes and lots of variation works. While working on the project we faced certain challenges due to the COVID-19 pandemic, in the period from the middle of the summer to the end of autumn 2020. Despite this fact, we have managed to adhere to the deadlines and complete our work in due course.
DRYWALL MACHINES UK

Hotel in Manchester

DRYWALL MACHINES UK | DRY-LINING SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | PARTITIONS SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | PLASTERING SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | SUSPENDED CEILINGS SERVICES

REQUEST A QUOTE

DRYWALL MACHINES UK | TAPE AND JOINTING SERVICES

REQUEST A QUOTE