Project · Circle Square, Manchester
Final-stage dry lining, ceilings, shaft walls, lift fronts and snagging on a six-floor hotel and car park within the Circle Square development.
✓ Type: Hotel and car park
✓ Location: Circle Square, Manchester
✓ Size: 6 floors, about 30 rooms per floor
Type
Location
Size
Period
We worked on Circle Square, a neighbourhood of offices, apartments, student accommodation and hotels. Our main work was a six-floor hotel with about 30 rooms per floor, plus a large car park with lifts and a restaurant with offices, comms rooms and staff areas.
Remedials and snagging of existing work
Suspended ceilings
Shaft walls and lift fronts
Soffit insulation to the car park
External SFS works
Access panels of various types and sizes
Variation works
We joined at the final stage, when first and second fix and most ceilings (including spray plastering) were complete. Despite the COVID-19 pandemic between mid-summer and late autumn 2020, we met the deadlines and completed our work on time.
Photos
Services on this project
Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.
4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK
074 133 50 960
0161 710 2510
info@drywallmachines.co.uk
Monday to Friday: 8am to 5pm
We use Google Analytics cookies to see how visitors use this site, so we can improve it. They are only set if you accept. Privacy policy