Project · Chester

Hotel Construction in Chester

Partitions, bulkheads and letterboxes for a hotel in a European chain: two four-storey blocks with heavily partitioned mezzanine and lower-ground floors.

✓ Type: Hotel new build

✓ Location: Chester

✓ Buildings: Two four-storey blocks

Tape and jointing in a hotel bedroom corridor, Chester

Type

Hotel new build

Location

Chester

Buildings

Two four-storey blocks

Access

MEWPs and towers (IPAF, PASMA)

Project overview

Drywall Machines took part in building a hotel in Chester for a European hotel chain. The project was made up of two four-storey blocks, where the mezzanine and lower-ground areas needed a lot of partitioning.

Our scope

First- and second-fix partitions

Numerous bulkheads throughout the building

Letterbox forming and other builders' works

High-level work from MEWPs and aluminium towers (IPAF and PASMA qualified)

Working through the pandemic

The site was shut during the first wave of COVID-19. We returned once the main contractor had put safety measures in place, with trade numbers reduced by 50% to work safely. None of our team caught COVID-19 during the project.

Photos

Project gallery

Services on this project

What we delivered

Planning a similar project?

Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

074 133 50 960

0161 710 2510

info@drywallmachines.co.uk

Monday to Friday: 8am to 5pm


    Please prove you are human by selecting the truck.