Office floor during partition installation, Northern Quarter, Manchester

Manchester City Centre Office Refurbishment

Project · Northern Quarter, Manchester

Manchester City Centre Office Refurbishment (NOMA)

Partitions, bulkheads, letterboxes, acoustic and fire-protection details for an office refurbishment in the Northern Quarter, part of the NOMA development.

✓ Type: Office refurbishment

✓ Location: Northern Quarter, Manchester

✓ Programme: February to May 2021

Office floor during partition installation, Northern Quarter, Manchester

Type

Office refurbishment

Location

Northern Quarter, Manchester

Programme

February to May 2021

Scope

Partitions, bulkheads, acoustic and fire details

Project overview

This office building, part of the NOMA development in the north of Manchester city centre, was partly rebuilt and partly left in its original condition. The floors were being divided into smaller rooms, and to save cost the rooms were left without new ceilings, which made the partition heads and acoustic details especially important.

Scope of works

Partition setting out and installation, including resilient bars

First- and second-fix boarding, insulation and pattresses

Bulkheads set out, framed and boarded in two layers

Letterboxes formed and lined to the partition specification, including below access floors

Acoustic barriers and decorative acoustic angles

Firebatt under glass partitions below service floor tiles

Rectification, patching and remedial works

Challenges

Partitions were fixed through the access floor to the structural slab, so floor tiles had to be lifted and relaid behind us. Head tracks had to be fixed around wide existing services close to the old ceiling, and with no lift big enough, boards were carried up the stairs. Bulkheads under the glass partitions were levelled stud by stud with C-clamps and green lasers, because there were no ceilings to brace them to.

Result

Despite COVID-19 restrictions, the work kept moving and was completed between February and May 2021. Photos of each trade on this project are on the Northern Quarter office refurbishment page.

Photos

Project gallery

Services on this project

What we delivered

Planning a similar project?

Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

074 133 50 960

0161 710 2510

info@drywallmachines.co.uk

Monday to Friday: 8am to 5pm


    Please prove you are human by selecting the truck.

    Renovated apartment interior in a Victorian house in Lytham St Annes

    Lytham St Annes – 2 bed Apartment Renovation

    Project · Lytham St Annes

    Two-Bed Apartment Renovation in Lytham St Annes

    Complete dry-lining renovation of an apartment in an 1896 house: new layout, insulated linings, fire-protected ceilings, plastering and decoration.

    ✓ Type: Residential renovation

    ✓ Location: Lytham St Annes, Lancashire

    ✓ Programme: September 2021 to February 2022

    Renovated apartment interior in a Victorian house in Lytham St Annes

    Type

    Residential renovation

    Location

    Lytham St Annes, Lancashire

    Programme

    September 2021 to February 2022

    Building

    House built in 1896

    Project overview

    The house was built in 1896 and split into three apartments in the 1960s. We stripped out the old ceilings and plaster and rebuilt the apartment room by room, dividing the largest room into an en-suite, a bedroom and a bathroom.

    Ceilings and fire protection

    Existing ceilings were insulated between the old joists with 100 mm Rockwool slab and boarded with Siniat GTEC Fire Board, with fire foam to the perimeter and fire taping to all joints. New MF suspended ceilings (Hadley metal) added a further 100 mm of insulation, giving 200 mm between floors, with light boxes built around spotlights to prevent overheating.

    Wall linings and partitions

    Gypliner wall lining system with 195 mm and 295 mm brackets

    50 mm Rockwool slab and foil vapour barrier to external and party walls

    Siniat GTEC dB acoustic plasterboard, double-skinned on party and external walls

    Partitions on 72 mm deep tracks with mastic-sealed tracks and abutments

    Damp-resistant abutment detail against uninsulated external walls

    Octagonal window bay and bulkhead formed in the lounge

    Wet rooms, plastering and decoration

    The bathroom and en-suite used moisture boards as the final layer and were tiled by others. Every room was plastered in Thistle Board Finish, mist coated and snagged under a task light, then decorated. Electrical work was carried out by our subcontractor, with an electrical safety certificate issued at handover.

    Photos

    Project gallery

    Planning a similar project?

    Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

    4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

    074 133 50 960

    0161 710 2510

    info@drywallmachines.co.uk

    Monday to Friday: 8am to 5pm


      Please prove you are human by selecting the key.

      Northern Quarter Office Refurbishment

      Northern Quarter Office Refurbishment

      Project · Northern Quarter,

      Northern Quarter office refurbishment in Manchester

      Northern Quarter Office Refurbishment

      Project · Northern Quarter, Manchester

      Northern Quarter Office Refurbishment: Work by Trade

      A photo record of our partition, bulkhead, letterbox, acoustic and finishing work on a Northern Quarter office refurbishment within the NOMA development.

      ✓ Type: Office refurbishment

      ✓ Location: Northern Quarter, Manchester

      ✓ Development: NOMA

      Northern Quarter office refurbishment in Manchester

      Type

      Office refurbishment

      Location

      Northern Quarter, Manchester

      Development

      NOMA

      Trades

      Partitions, dry lining, finishing

      About this project

      Our team set out and built partitions with resilient bars, framed and boarded bulkheads, formed letterboxes (including below access floors) and installed acoustic barriers and acoustic angles. The full project write-up is on the Manchester city centre office refurbishment page.

      Work shown in the gallery

      Setting out and first-fix metal works

      Partition boarding, first and second fix

      Bulkhead framing and boarding

      Letterbox cut-outs and framing

      Insulation, pattresses and acoustic barriers

      Patching, rectification and back boarding

      Photos

      Project gallery

      Services on this project

      What we delivered

      Planning a similar project?

      Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

      4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

      074 133 50 960

      0161 710 2510

      info@drywallmachines.co.uk

      Monday to Friday: 8am to 5pm


        Please prove you are human by selecting the flag.

        Converted historic mill buildings in Ancoats, Manchester

        Luxury Apartments in Manchester, Ancoats. Historical Refurbishment Project

        Project · Ancoats, Manchester

        Luxury Apartments in Ancoats: Historic Mill Refurbishment

        Dry lining on the refurbishment of three historic mills in Ancoats, around 200 years old, linked by a new building to form four apartment blocks.

        ✓ Type: Historic refurbishment and new build

        ✓ Location: Ancoats, Manchester

        ✓ Buildings: Three old mills + new link building

        Converted historic mill buildings in Ancoats, Manchester

        Type

        Historic refurbishment and new build

        Location

        Ancoats, Manchester

        Buildings

        Three old mills + new link building

        Role

        Dry-lining subcontractor

        Project overview

        Drywall Machines worked on the refurbishment of three old mills that are part of Manchester's history, dating back around 200 years. A new building was constructed to link them, creating four large apartment blocks with a private yard, a detached house and a semi-detached house in the middle. We joined at the middle stage and helped deliver the project.

        Challenges

        Multiple drawing revisions to track throughout

        The largest number of details, specs and wall and ceiling types in any of our project packs

        Compliance with British Standards for fire protection and soundproofing, achieved with the help of British Gypsum engineers

        Safety and result

        Despite the complexity, the number of accidents was kept very low, and the few minor incidents were fully investigated to prevent further issues. It is the most complicated job Drywall Machines has taken part in.

        Photos

        Project gallery

        Planning a similar project?

        Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

        4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

        074 133 50 960

        0161 710 2510

        info@drywallmachines.co.uk

        Monday to Friday: 8am to 5pm


          Please prove you are human by selecting the tree.

          Salford Quays Apartments

          Salford Quays Apartments

          Project · Salford Quays

          Duet apartment blocks at Salford Quays

          Salford Quays Apartments

          Project · Salford Quays

          Salford Quays Apartments: 270 Apartments in Two Blocks

          Dry lining on two 15-storey apartment blocks with a link bridge, plus a gym, offices and meeting rooms, from the early stages to completion.

          ✓ Type: Commercial residential new build

          ✓ Location: Salford Quays

          ✓ Size: 2 blocks, 15 floors, 270 apartments

          Duet apartment blocks at Salford Quays

          Type

          Commercial residential new build

          Location

          Salford Quays

          Size

          2 blocks, 15 floors, 270 apartments

          Role

          Dry-lining subcontractor

          Project overview

          This large commercial project consisted of two apartment blocks linked by a bridge, 15 floors and 270 apartments in total, plus ground-floor and mezzanine facilities including a gym, offices and meeting rooms. We joined at an early stage and helped deliver it on time.

          Challenges

          The project had a large number of details, specifications and ceiling types, and we took over part of the work from another contractor who had been removed from site.

          Safety and result

          No accidents happened during the project, and the few minor incidents were fully investigated. It was one of the most challenging jobs Drywall Machines has taken part in.

          Photos

          Project gallery

          Planning a similar project?

          Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

          4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

          074 133 50 960

          0161 710 2510

          info@drywallmachines.co.uk

          Monday to Friday: 8am to 5pm


            Please prove you are human by selecting the star.

            Hotel in Chester

            Hotel in Chester

            Project · Chester Hotel

            Work in progress at Hotel in Chester

            Hotel in Chester

            Project · Chester

            Hotel Construction in Chester

            Partitions, bulkheads and letterboxes for a hotel in a European chain: two four-storey blocks with heavily partitioned mezzanine and lower-ground floors.

            ✓ Type: Hotel new build

            ✓ Location: Chester

            ✓ Buildings: Two four-storey blocks

            Tape and jointing in a hotel bedroom corridor, Chester

            Type

            Hotel new build

            Location

            Chester

            Buildings

            Two four-storey blocks

            Access

            MEWPs and towers (IPAF, PASMA)

            Project overview

            Drywall Machines took part in building a hotel in Chester for a European hotel chain. The project was made up of two four-storey blocks, where the mezzanine and lower-ground areas needed a lot of partitioning.

            Our scope

            First- and second-fix partitions

            Numerous bulkheads throughout the building

            Letterbox forming and other builders' works

            High-level work from MEWPs and aluminium towers (IPAF and PASMA qualified)

            Working through the pandemic

            The site was shut during the first wave of COVID-19. We returned once the main contractor had put safety measures in place, with trade numbers reduced by 50% to work safely. None of our team caught COVID-19 during the project.

            Photos

            Project gallery

            Services on this project

            What we delivered

            Planning a similar project?

            Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

            4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

            074 133 50 960

            0161 710 2510

            info@drywallmachines.co.uk

            Monday to Friday: 8am to 5pm


              Please prove you are human by selecting the star.