Finished office ceiling and walls after the Swinton office renovation

Office Renovation in Swinton, Manchester (North West) – Full Dry-Lining & …

Project · Swinton, Salford

Office Renovation in Swinton: Full Dry Lining and Internal Fit-Out

A complete dry-lining package for an estate agency's office, delivered on a tight programme so staff could get back to work quickly.

✓ Type: Dry lining and internal fit-out

✓ Location: Swinton, Salford

✓ Client: Commercial (estate agency)

Finished office ceiling and walls after the Swinton office renovation

Type

Dry lining and internal fit-out

Location

Swinton, Salford

Client

Commercial (estate agency)

Duration

3 months

Project overview

We delivered a complete dry-lining package for a commercial office renovation in Swinton, working under tight deadlines so the client could reopen and get their staff back in as quickly as possible.

Scope of works

First-fix metal framing to ceilings, partitions and wall linings

Beam encasements and vapour barrier installation

Pattresses fitted throughout for future fixings

Second fix to ceilings in double-skin fire-rated Siniat plasterboard with 100 mm acoustic insulation

Partitions and wall linings in Siniat soundproof boards: dual layer to party walls, single elsewhere

Full plaster finish throughout

Challenges

The building is part commercial and part residential, so fire regulations and building codes had to be followed carefully, with several tricky areas solved on site. With other trades following close behind, we kept the programme moving every day and finished without delays.

Result

Staff returning to work were impressed by the new workspace. The upgraded insulation and vapour barrier made a noticeable difference, especially in summer, thanks to the full-height glazed front. Following this project, Drywall Machines became accredited by the Federation of Master Builders (FMB) and TrustMark.

Photos

Project gallery

Services on this project

What we delivered

Planning a similar project?

Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

074 133 50 960

0161 710 2510

info@drywallmachines.co.uk

Monday to Friday: 8am to 5pm


    Please prove you are human by selecting the house.

    Office floor during partition installation, Northern Quarter, Manchester

    Manchester City Centre Office Refurbishment

    Project · Northern Quarter, Manchester

    Manchester City Centre Office Refurbishment (NOMA)

    Partitions, bulkheads, letterboxes, acoustic and fire-protection details for an office refurbishment in the Northern Quarter, part of the NOMA development.

    ✓ Type: Office refurbishment

    ✓ Location: Northern Quarter, Manchester

    ✓ Programme: February to May 2021

    Office floor during partition installation, Northern Quarter, Manchester

    Type

    Office refurbishment

    Location

    Northern Quarter, Manchester

    Programme

    February to May 2021

    Scope

    Partitions, bulkheads, acoustic and fire details

    Project overview

    This office building, part of the NOMA development in the north of Manchester city centre, was partly rebuilt and partly left in its original condition. The floors were being divided into smaller rooms, and to save cost the rooms were left without new ceilings, which made the partition heads and acoustic details especially important.

    Scope of works

    Partition setting out and installation, including resilient bars

    First- and second-fix boarding, insulation and pattresses

    Bulkheads set out, framed and boarded in two layers

    Letterboxes formed and lined to the partition specification, including below access floors

    Acoustic barriers and decorative acoustic angles

    Firebatt under glass partitions below service floor tiles

    Rectification, patching and remedial works

    Challenges

    Partitions were fixed through the access floor to the structural slab, so floor tiles had to be lifted and relaid behind us. Head tracks had to be fixed around wide existing services close to the old ceiling, and with no lift big enough, boards were carried up the stairs. Bulkheads under the glass partitions were levelled stud by stud with C-clamps and green lasers, because there were no ceilings to brace them to.

    Result

    Despite COVID-19 restrictions, the work kept moving and was completed between February and May 2021. Photos of each trade on this project are on the Northern Quarter office refurbishment page.

    Photos

    Project gallery

    Services on this project

    What we delivered

    Planning a similar project?

    Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

    4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

    074 133 50 960

    0161 710 2510

    info@drywallmachines.co.uk

    Monday to Friday: 8am to 5pm


      Please prove you are human by selecting the truck.

      Renovated apartment interior in a Victorian house in Lytham St Annes

      Lytham St Annes – 2 bed Apartment Renovation

      Project · Lytham St Annes

      Two-Bed Apartment Renovation in Lytham St Annes

      Complete dry-lining renovation of an apartment in an 1896 house: new layout, insulated linings, fire-protected ceilings, plastering and decoration.

      ✓ Type: Residential renovation

      ✓ Location: Lytham St Annes, Lancashire

      ✓ Programme: September 2021 to February 2022

      Renovated apartment interior in a Victorian house in Lytham St Annes

      Type

      Residential renovation

      Location

      Lytham St Annes, Lancashire

      Programme

      September 2021 to February 2022

      Building

      House built in 1896

      Project overview

      The house was built in 1896 and split into three apartments in the 1960s. We stripped out the old ceilings and plaster and rebuilt the apartment room by room, dividing the largest room into an en-suite, a bedroom and a bathroom.

      Ceilings and fire protection

      Existing ceilings were insulated between the old joists with 100 mm Rockwool slab and boarded with Siniat GTEC Fire Board, with fire foam to the perimeter and fire taping to all joints. New MF suspended ceilings (Hadley metal) added a further 100 mm of insulation, giving 200 mm between floors, with light boxes built around spotlights to prevent overheating.

      Wall linings and partitions

      Gypliner wall lining system with 195 mm and 295 mm brackets

      50 mm Rockwool slab and foil vapour barrier to external and party walls

      Siniat GTEC dB acoustic plasterboard, double-skinned on party and external walls

      Partitions on 72 mm deep tracks with mastic-sealed tracks and abutments

      Damp-resistant abutment detail against uninsulated external walls

      Octagonal window bay and bulkhead formed in the lounge

      Wet rooms, plastering and decoration

      The bathroom and en-suite used moisture boards as the final layer and were tiled by others. Every room was plastered in Thistle Board Finish, mist coated and snagged under a task light, then decorated. Electrical work was carried out by our subcontractor, with an electrical safety certificate issued at handover.

      Photos

      Project gallery

      Planning a similar project?

      Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

      4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

      074 133 50 960

      0161 710 2510

      info@drywallmachines.co.uk

      Monday to Friday: 8am to 5pm


        Please prove you are human by selecting the heart.

        Northern Quarter Office Refurbishment

        Northern Quarter Office Refurbishment

        Project · Northern Quarter,

        Northern Quarter office refurbishment in Manchester

        Northern Quarter Office Refurbishment

        Project · Northern Quarter, Manchester

        Northern Quarter Office Refurbishment: Work by Trade

        A photo record of our partition, bulkhead, letterbox, acoustic and finishing work on a Northern Quarter office refurbishment within the NOMA development.

        ✓ Type: Office refurbishment

        ✓ Location: Northern Quarter, Manchester

        ✓ Development: NOMA

        Northern Quarter office refurbishment in Manchester

        Type

        Office refurbishment

        Location

        Northern Quarter, Manchester

        Development

        NOMA

        Trades

        Partitions, dry lining, finishing

        About this project

        Our team set out and built partitions with resilient bars, framed and boarded bulkheads, formed letterboxes (including below access floors) and installed acoustic barriers and acoustic angles. The full project write-up is on the Manchester city centre office refurbishment page.

        Work shown in the gallery

        Setting out and first-fix metal works

        Partition boarding, first and second fix

        Bulkhead framing and boarding

        Letterbox cut-outs and framing

        Insulation, pattresses and acoustic barriers

        Patching, rectification and back boarding

        Photos

        Project gallery

        Services on this project

        What we delivered

        Planning a similar project?

        Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

        4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

        074 133 50 960

        0161 710 2510

        info@drywallmachines.co.uk

        Monday to Friday: 8am to 5pm


          Please prove you are human by selecting the key.

          Converted historic mill buildings in Ancoats, Manchester

          Luxury Apartments in Manchester, Ancoats. Historical Refurbishment Project

          Project · Ancoats, Manchester

          Luxury Apartments in Ancoats: Historic Mill Refurbishment

          Dry lining on the refurbishment of three historic mills in Ancoats, around 200 years old, linked by a new building to form four apartment blocks.

          ✓ Type: Historic refurbishment and new build

          ✓ Location: Ancoats, Manchester

          ✓ Buildings: Three old mills + new link building

          Converted historic mill buildings in Ancoats, Manchester

          Type

          Historic refurbishment and new build

          Location

          Ancoats, Manchester

          Buildings

          Three old mills + new link building

          Role

          Dry-lining subcontractor

          Project overview

          Drywall Machines worked on the refurbishment of three old mills that are part of Manchester's history, dating back around 200 years. A new building was constructed to link them, creating four large apartment blocks with a private yard, a detached house and a semi-detached house in the middle. We joined at the middle stage and helped deliver the project.

          Challenges

          Multiple drawing revisions to track throughout

          The largest number of details, specs and wall and ceiling types in any of our project packs

          Compliance with British Standards for fire protection and soundproofing, achieved with the help of British Gypsum engineers

          Safety and result

          Despite the complexity, the number of accidents was kept very low, and the few minor incidents were fully investigated to prevent further issues. It is the most complicated job Drywall Machines has taken part in.

          Photos

          Project gallery

          Planning a similar project?

          Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

          4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

          074 133 50 960

          0161 710 2510

          info@drywallmachines.co.uk

          Monday to Friday: 8am to 5pm


            Please prove you are human by selecting the plane.

            Manchester City Centre Apartments

            Manchester City Centre Apartments

            Project · Manchester city

            Luxury apartment tower in Manchester city centre

            Manchester City Centre Apartments

            Project · Manchester city centre

            Luxury New-Build Apartments in Manchester City Centre

            Setting out, shaft walls, first and second fix and MF ceilings across three blocks of luxury apartments, town houses and penthouses.

            ✓ Type: Luxury new-build apartments

            ✓ Location: Manchester city centre

            ✓ Peak labour: 15 fixers

            Luxury apartment tower in Manchester city centre

            Type

            Luxury new-build apartments

            Location

            Manchester city centre

            Peak labour

            15 fixers

            System

            Speedline spec, British Gypsum boards

            Project overview

            From outside this is another tall building, but inside it includes a spa with a large swimming pool on the ground floor, its own garden, town houses from ground to second floor along all three blocks, high ceilings and windows on the third floor, many apartment designs and a penthouse in each block. Work was carried out during the COVID-19 period with masks and regular testing on site.

            Our scope

            Setting out

            Shaft walls, including smoke shafts and service risers

            First fix: metal framing and boarding to party walls and partitions

            Second fix: vapour barrier, insulation and boarding

            MF ceilings framed and boarded, with a mastic seal to the perimeter for sound and air tightness

            Rectification and remedial works after M&E

            Team

            The project used the Speedline specification with British Gypsum boards, and our labour peaked at 15 fixers. We are always happy to supply workforce to existing clients and welcome new ones.

            Photos

            Project gallery

            Planning a similar project?

            Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

            4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

            074 133 50 960

            0161 710 2510

            info@drywallmachines.co.uk

            Monday to Friday: 8am to 5pm


              Please prove you are human by selecting the star.

              Salford Quays Apartments

              Salford Quays Apartments

              Project · Salford Quays

              Duet apartment blocks at Salford Quays

              Salford Quays Apartments

              Project · Salford Quays

              Salford Quays Apartments: 270 Apartments in Two Blocks

              Dry lining on two 15-storey apartment blocks with a link bridge, plus a gym, offices and meeting rooms, from the early stages to completion.

              ✓ Type: Commercial residential new build

              ✓ Location: Salford Quays

              ✓ Size: 2 blocks, 15 floors, 270 apartments

              Duet apartment blocks at Salford Quays

              Type

              Commercial residential new build

              Location

              Salford Quays

              Size

              2 blocks, 15 floors, 270 apartments

              Role

              Dry-lining subcontractor

              Project overview

              This large commercial project consisted of two apartment blocks linked by a bridge, 15 floors and 270 apartments in total, plus ground-floor and mezzanine facilities including a gym, offices and meeting rooms. We joined at an early stage and helped deliver it on time.

              Challenges

              The project had a large number of details, specifications and ceiling types, and we took over part of the work from another contractor who had been removed from site.

              Safety and result

              No accidents happened during the project, and the few minor incidents were fully investigated. It was one of the most challenging jobs Drywall Machines has taken part in.

              Photos

              Project gallery

              Planning a similar project?

              Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

              4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

              074 133 50 960

              0161 710 2510

              info@drywallmachines.co.uk

              Monday to Friday: 8am to 5pm


                Please prove you are human by selecting the tree.

                Hotel in Manchester City Centre

                Hotel in Manchester City Centre

                Project · Circle Square,

                Work in progress at Hotel in Manchester City Centre

                Hotel in Manchester City Centre

                Project · Circle Square, Manchester

                Hotel at Circle Square, Manchester City Centre

                Final-stage dry lining, ceilings, shaft walls, lift fronts and snagging on a six-floor hotel and car park within the Circle Square development.

                ✓ Type: Hotel and car park

                ✓ Location: Circle Square, Manchester

                ✓ Size: 6 floors, about 30 rooms per floor

                Completed hotel corridor, Premier Inn Manchester

                Type

                Hotel and car park

                Location

                Circle Square, Manchester

                Size

                6 floors, about 30 rooms per floor

                Period

                Summer to autumn 2020

                Project overview

                We worked on Circle Square, a neighbourhood of offices, apartments, student accommodation and hotels. Our main work was a six-floor hotel with about 30 rooms per floor, plus a large car park with lifts and a restaurant with offices, comms rooms and staff areas.

                Our scope

                Remedials and snagging of existing work

                Suspended ceilings

                Shaft walls and lift fronts

                Soffit insulation to the car park

                External SFS works

                Access panels of various types and sizes

                Variation works

                Result

                We joined at the final stage, when first and second fix and most ceilings (including spray plastering) were complete. Despite the COVID-19 pandemic between mid-summer and late autumn 2020, we met the deadlines and completed our work on time.

                Photos

                Project gallery

                Services on this project

                What we delivered

                Planning a similar project?

                Tell us about your project, the location and the timescale. Call, WhatsApp or email us, or send the form and we will get back to you.

                4 Kingston Mill, Cobden Street, Salford, M6 6WG, Greater Manchester, UK

                074 133 50 960

                0161 710 2510

                info@drywallmachines.co.uk

                Monday to Friday: 8am to 5pm


                  Please prove you are human by selecting the flag.